Forum Replies Created

Viewing 1 post (of 1 total)
  • Author
    Posts
  • in reply to: 2d drawing associated texts #1566

    Cimonc
    Participant

    Hi dudes and dudettes!
    New to this forum and to vba programing, something that Im hoping to become better at. I have a question about how to automate a workflow that i basically the same over and over again.
    So resently I have been working with alot of drawing updates and working with different version of the same partnumber.
    For every new version I have to these steps for every view/dwg:
    1) unlock the view (only one view)
    2) save and take out a new version
    3) go into “edit->links”
    4) go into pointed documents, locate the latest version and point the link to that
    5) update view

    Now is there a way to automate this through vba? Anyone who have seen this before?
    Where should I start ? 🙂

    /Simon

Viewing 1 post (of 1 total)